
Check Our Services(New Pools, Jacuzzi & Designs)

Dimensions are always double-checked to ensure that the fibreglass pool is placed one hundred percent correctly.

A channel is dug next to the swimming pool that leads to the pump station for all the pipes.

With careful planning, exact positioning and the use of a crane, we place the fibreglass pool in the correct position.

The fibreglass pool is then successfully lowered into the base that has been prepared.

The last alterations are made to the pool that is now grounded.

Once all the plumbing work is finished, dirt that has been removed will be used to fill the area surrounding the pool. This takes approximately 4 hours subject to the size of the pool.